Retscreen expert user manual pdf free.Retscreen User Manual

Looking for:

Looking for:

Retscreen expert user manual pdf free

Click here to Download

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Note: This column is only visible if the proposed project includes cooling.
 
 

Retscreen Manual (CHP) – replace.me – Welcome back

 
These meters record district heating water flow through the energy transfer station. This value is used to calculate the power net average load in the “Proposed case load characteristics” section, the net peak electricity load and the net electricity demand for the proposed case system. If the building needs to be converted from steam or electric baseboard heating, the costs are substantially higher and should be confirmed by a local contractor.

 

Retscreen Manual (CHP) – replace.me – Transcript

 
If the “Standard” option is selected, the process load is assumed to be the same for each month of the year and is calculated based on the peak process heating load and the equivalent full load hours for the process heating load. It also includes the cost for the replacement of existing sidewalks. For more information, see the Technical note on heating network design. Total heating demand The model calculates the annual total heating demand for the building, the building zone or the building cluster. This value is used to calculate the heating system average load in the “Proposed case load characteristics” section at the bottom of this worksheet, as well as the net peak heating load and the net heating demand for the proposed case system.

 
 

Retscreen expert user manual pdf free

 
 
Electricity demand The model calculates annual electricity demand. Power capacity ST [- without extraction] The model calculates the power capacity of the steam turbine ST without extraction. Back-up cooling system optional , which is used in case of interruption of the other systems.